日韩一区二区三区免费播放,亚洲另类视频,麻豆一区二区,石原莉奈一区二区三区在线观看

Page Options
>> >>view
Torch Station of Nanzhong Intercity Railway makes new progress
2024-02-22

0222-7.jpg


The Nansha-Zhongshan Intercity Railway Torch Station resumed construction after the Spring Festival holiday on February 20, and the project is undergoing construction on its underground levels, providing a solid foundation for the subsequent construction of the main structure.


At 9:00 am, the construction site on Shiji 1st Road in Torch Development Zone resounded with the roaring sound of excavator operation, signaling the commencement of foundation pit excavation.


The station includes three underground levels, with the first underground level being the Gangxiang Tunnel, and the second and third underground levels being the Torch Station. The station is 272 meters long and 29.5 meters wide, with a total construction area of 26,295.98 square meters. The total length of the construction area is 3,622 meters, with a total cost of 980 million yuan.


The 10 construction sites of the Nansha-Zhongshan Intercity Railway Zhongshan section have entered the construction phase. Xingzhong Station, Shiqi Station and Qijiangdao Station (formerly Qijiang New Town Station) are currently undergoing wall construction for the main structures.

Close】 【Print
ICP?Registration?Number:?粵ICP備?11005604號
Police?Registration?Number:?44200002442868
Website?ID:?4420000052
Sponsored?by:??Office?of?Zhongshan?Municipal?People's?Government
Technical?Support:???Information?Center?of?Zhongshan
Without?written?authorization?from??Zhongshan?Municipal?People’s?Government,?the?content?of?the?site?shall?not?be?republished?or?used?in?any?form.
About Us | Site Map| Privacy Statement| Contact us
主站蜘蛛池模板: 扬州市| 周口市| 隆化县| 扎兰屯市| 景东| 喀喇沁旗| 梁平县| 五台县| 琼结县| 泸水县| 乃东县| 当涂县| 额济纳旗| 澄江县| 永嘉县| 金阳县| 诸城市| 和平区| 威海市| 西畴县| 房产| 永德县| 大邑县| 淮阳县| 公主岭市| 石景山区| 县级市| 灌云县| 巴彦淖尔市| 弥渡县| 涿州市| 渭南市| 宁海县| 嘉禾县| 咸阳市| 鄂伦春自治旗| 额尔古纳市| 化德县| 靖宇县| 奈曼旗| 抚宁县|